Brands

Filter By

Categories

Categories

Brand

Brand

POWER

POWER

POWER SUPPLY

POWER SUPPLY

HEATING

HEATING

Active filters

  • POWER: 115 KW
  • POWER: 115 KW
  • POWER: 170-850 KW

BALTUR TBG 85P (MB 420-13) 170-850KW...

Price €4,250.00

Two-Stage Gas Burner Power 170÷850KW, with Air and Head Position Adjustment, Easy Maintenance due to Dispersion Unit Position, Rolling Flange, Electric Air Damper, Gas Line with Safety Solenoid Valve, Minimum Gas Piezostat, Pressure Regulator & Gas Filter, Ionization Electrode for Flame Detection, Seven Pole Quick Coupler, Four Pole Coupler for 2nd Stage, IP40

BALTUR TBG 85PN (MB412-32) 170-850KW...

Price €3,720.00

Two Stage Progressive Operation Gas Burner Power 170÷850KW, with Air and Head Position Adjustment, Easy Maintenance due to Dispersion Unit Position, Rolling Flange, Electric Air Damper, Gas Line with Safety Solenoid Valve, Minimum Gas Pressure Regulator, Pressure Regulator & Filter A element , Ionization Electrode for Flame Detection, Seven Pole Quick Coupler, Four Pole Coupler for 2nd Stage, IP44

DE DIETRICH EVODENS PRO 115 AMC 114KW...

Price €3,950.00

Wall Mounted Condensing Gas Boilers for Central Heating Installations, Degree of Efficiency up to 109%, Reduced Pollutant Emissions, Power Adjustment from 18~100% of Nominal Power, Compact Dimensions for Easy Installation even in the smallest Boiler Rooms, Boiler body made of Aluminum-Silicon alloy with 5-year Combustion Chamber Warranty, Possibility to Connect to an Array of up to 10 Boilers, the DIEMATIC iSYSTEM panel is provided for the management of heating systems

CHAFFOTEAUX TALIA GREEN EVO SYSTEM HP...

Price €4,855.00

Wall-Mounted Condensing Gas Boiler for Heating and DHW Production, with Efficiency up to 108%, Stainless Steel Exchanger, Analog Climatic Temperature Adjustment in 2 Heating Zones, LCD Display, Electronic Control Unit for Installation in Arrays, Automatic Ventilation Function

BALTUR SMILE ENERGY 115 115KW...

Price €5,200.00

Wall-Mounted Condensing Gas Boiler for Heating and Hot Water Production, with Special Spiral Heat Exchanger, Analog Function with a Range of 12÷100%, Built-in Compensation Function, Display Screen, Self-Check System and Double Fault Reporting System with Light Indicator, Safety Device for Control Flue Gas Discharge, Boiler, Solar and Remote Control Connection Possibility

ARISTON GENUS PREMIUM EVO HP 115...

Price €5,280.00

Wall Mounted Condensing Gas Boiler for Heating Only for Installation of up to 6 Boilers in Array or 8 Boilers "Back to Back", Large Backlit Display, Stainless Steel Primary Heat Exchanger, High Efficiency Continuous Configuration Circulator

BALTUR TBG 85P (MB 412-04) 170-850KW...

Price €3,825.00

Two-Stage Gas Burner Power 170÷850KW, with Air and Head Position Adjustment, Easy Maintenance due to Dispersion Unit Position, Rolling Flange, Electric Air Damper, Gas Line with Safety Solenoid Valve, Minimum Gas Piezostat, Pressure Regulator & Gas Filter, Ionization Electrode for Flame Detection, Seven Pole Quick Coupler, Four Pole Coupler for 2nd Stage, IP40

BALTUR TBG 85P (MB 415) 170-850KW TWO...

Price €4,182.00

Two-Stage Gas Burner Power 170÷850KW, with Air and Head Position Adjustment, Easy Maintenance due to Dispersion Unit Position, Rolling Flange, Electric Air Damper, Gas Line with Safety Solenoid Valve, Minimum Gas Piezostat, Pressure Regulator & Gas Filter, Ionization Electrode for Flame Detection, Seven Pole Quick Coupler, Four Pole Coupler for 2nd Stage, IP40

BALTUR TBG 85PN (MB415-07) 170-850KW...

Price €3,900.00

Two Stage Progressive Operation Gas Burner Power 170÷850KW, with Air and Head Position Adjustment, Easy Maintenance due to Dispersion Unit Position, Rolling Flange, Electric Air Damper, Gas Line with Safety Solenoid Valve, Minimum Gas Pressure Regulator, Pressure Regulator & Filter A element , Ionization Electrode for Flame Detection, Seven Pole Quick Coupler, Four Pole Coupler for 2nd Stage, IP44

BALTUR TBG 85PN (MB420) 170-850KW...

Price €4,100.00

Two Stage Progressive Operation Gas Burner Power 170÷850KW, with Air and Head Position Adjustment, Easy Maintenance due to Dispersion Unit Position, Rolling Flange, Electric Air Damper, Gas Line with Safety Solenoid Valve, Minimum Gas Pressure Regulator, Pressure Regulator & Filter A element , Ionization Electrode for Flame Detection, Seven Pole Quick Coupler, Four Pole Coupler for 2nd Stage, IP44